Search MasterMetals’ X Tweets

Monday, April 22, 2024

$ATY.v Q1 Production from El Roble mine: 3.34 MM lbs of #copper, +44% 2156 oz. of #gold, -16%, vs. same period in 2023. •Copper head grade of 2.51%, +34% over Q1 2023. •Gold head grade of 1.64 grams per tonne; - 25% over Q1 2023. https://bit.ly/4b6bPMX


From MasterMetals
April 23, 2024 at 01:29AM
https://twitter.com/MasterMetals/status/1782552250973290736

No comments:

Post a Comment

ShareThis